Chasewater was challenged to install two high quality, high acoustic movable walls to the 17th & 18 floors of one of the major office blocks of one on our main cities. Our client was under pressure to complete the project within a specific timescale. The tracks and panels had to be installed within 5 working weeks.
Access was the main concern with this project as lifting the panels to these floor levels is very much a health & safety concern.
After a detailed survey it was decided that the panels would fit into the lift if the number of panels for each wall was increased, reducing the width of the panels and therefore allowing the panels to fit safely into the lift.
The tracks were installed over two days just before Christmas with the panels being installed by the end of January.
Another happy client. And as usual our management staff returned to site to show the client exactly how to operate the walls once the project had been completed.
Chasewater work nation wide and our walls can be found as far north as the Shell 'Gannet' oil rig in the north sea and as far south as Guernsey.